PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed storm piping at the Main Lobby going into the 2nd floor Facing East.jpg Set the door frames at the 1st floor Cells Facing West.jpg Sheet rock and metal studs delivery for the Roof.jpg Continued installing duct work at the 2nd floor Facing East.jpg Continued installing sprinkler branches at the 1st floor Facing North.jpg
Next page Installed storm piping at the Main Lobby going into the 2nd floor Facing East
Installed storm piping at the Main Lobby going into the 2nd floor Facing East